30-Hour Water Supply Cut in Bandra, Matunga and Dharavi From Friday

Brihanmumbai Municipal Corporation Updates,Upper Vaitarna water main in Santacruz,Bandra railway terminus supply zone,Matunga Labour Camp area,Bandra, Matunga and Dharavi water crisis,water shortage in mumbai,Bandra, Matunga and Dharavi Updates,Bandra Updates
The maximum city will be hit by 30-hour water cut from Friday morning till Saturday as the Brihanmumbai Municipal Corporation (BMC) plans to carry out maintenance work to stop leakage on one of its main water lines. The disruption in water supply will affect Bandra, Matunga and Dharavi areas of Mumbai city, Times of India reported.

The complete water cut will be effective from 10 am on Friday, September 12, till Saturday at 4 pm. The water cut will hit the Bandra railway terminus supply zone and Matunga Labour Camp area and also Dharavi. The civic body has proposed to stop leakage on 2400mm Upper Vaitarna water main in Santacruz (east). 

According to reports, it took BMC almost three days to locate the leaking pipeline as it was around 30-feet below the ground surface. The leakage was detected on August 30. The work was delayed as it required arresting water supply to Dharavi, Matunga and Bandra terminus area, which was not possible due to Ganesh Chaturthi 2019 and Muharram.Bandra, Matunga and Dharavi
 
 

0 Comments

Click here to Write a comment ...
Post comment
Cancel
    Please submit your comments.